Investors
Waste is a daily, contracted volume.
Pragmatix Ceylon is developing circular infrastructure in Jaffna District, Sri Lanka. The model connects verified feedstock, appropriate processing and productive uses. All capacity figures below are clearly identified as proposed targets.
01Investment logic
01
Feedstock before capacity
Volume and composition are verified before a facility is sized. This is the single largest cause of failure in waste infrastructure, and the first thing we de-risk.
02
Offtake before commitment
Buyers are qualified against specification before capital is committed, so recovered material has a market rather than a warehouse.
03
Modular and replicable
Each facility is designed as a repeatable module. Proving one district creates a template rather than a one-off asset.
04
Infrastructure duration
Waste arrives every day. Contracted supply and long-horizon offtake suit patient, infrastructure-style capital rather than short cycles.
02Development pipeline · Jaffna District
- PROPOSED
Stage 01 — Valvettithurai Plastics
Valvettithurai, Jaffna District · Waste plastics
3–5 TPD
Proposed proof-of-concept capacity
- IN DEVELOPMENT
Stage 02 — Mulli Organics
Mulli, Vadamarachchi South West, Jaffna District · Biodegradable waste
50 TPD
Proposed proof-of-concept capacity
- CONCEPT
Stage 03 — Jaffna Integrated SWM
Valikamam East, Jaffna District · Municipal solid waste
District-wide scope
Intended scope — capacity not yet defined
All three proposed stages are in Jaffna District. Plastics and composting establish the proof of concept; integrated mixed-waste processing is the larger model.
03The scale model
Three levers, not one bet.
01
Geography
Beginning in Jaffna, the model is designed to expand through Northern and Eastern Sri Lanka, other regions of the island and, over time, selected international markets.
- Jaffna DistrictPLANNED
- Northern ProvinceTARGET
- Eastern and other Sri Lankan regionsLONG-TERM AMBITION
- Mauritius · selected African marketsLONG-TERM AMBITION
02
Materials
The model is intended to move beyond initial plastics and organics toward the full municipal waste stream: paper, metals, glass, rubber, coconut waste, textiles, sanitary waste, e-waste and inert material.
- Plastics · OrganicsPLANNED
- Broader plasticsTARGET
- Paper · Metals · Glass · Rubber · TextilesLONG-TERM AMBITION
- Sanitary · E-waste · Inert wasteLONG-TERM AMBITION
03
Products
Over time, Pragmatix intends to move further downstream — from processed materials such as plastic pellets into higher-value finished products, including applications such as furniture.
- Recovered wastePLANNED
- Processed materialTARGET
- Pellets and compostTARGET
- Finished productsLONG-TERM AMBITION
Expansion by geography, materials and productive uses describes the long-term direction of the model.
04What we are looking for
Development capital
To advance feasibility, permitting and site preparation.
Equipment finance
For processing lines specified to verified material streams.
Strategic partners
Operators and offtakers who want long-term supply, not a pilot.
Request the investor briefing.